City of Waycross Engineering Division

The City of Waycross Engineering Division is responsible for programming, design, construction, operations, and maintenance of the City’s primary infrastructure including but not limited to city pavements and sidewalks, storm drainage, water production and distribution, waste-water collection and treatment, traffic signals, signs and public buildings.

The Engineering Division also provides technical support to other city departments and citizens to include environmental permitting, traffic engineering, street lighting, street/alley closings, annexations, computer-aided drafting, mapping and geographical information system development.

The Team

  • Engineering Coordinator

    Dawn Strickland

    Provides administrative support for the City Engineer and departmental staff. This includes conducting extensive research, arranging schedules, handling calls and correspondence, liaising with internal and external parties, reviewing contracts and other documentation, and managing the flow of documents and information across the department.

  • Project Manager

    Steve Pope

    The Project Manager is responsible for capital project master plan development and execution. This position plans, programs and manages capital projects for the City’s primary infrastructure (storm-water, pavement and underground utilities).

Street Paving Update

The current street paving list was developed using advanced robotics data combined with Georgia Department of Transportation (GDOT) usage statistics. This technology-driven approach enabled us to rank streets from those most in need of paving to those least, ensuring an efficient and data-informed strategy. Our long-term goal is to repave 200 streets over the next 10 years.

If you have questions or would like more information, please get in touch with City Manager Duke Rayford to schedule a time to discuss.

Street List

  • COMPLETED STREET PAVING
    JANE STREET
    HANOVER DRIVE
    BEVILLE STREET
    RICHMOND AVENUE
    N. CRAWFORD STREET
  • IN PROGRESS STREET PAVING
    1 GILMORE ST (North) 80.03
    2 KENTUCKY AVE 78.33
    4 PARKWAY DR 70.03
    7 PALMETTO RD 66.95
    8 OLD BRUNEL ST 66.76
    9 NICHOLLS ST N 66.43
    10 BRUNEL ST 66.36
    11 GARLINGTON HGTS 66.22
    12 SCREVEN AVE 66.04
    13 SOLOMON ST 66.04
    14 WASHINGTON AVE 65.72
  • ONGOING STREET PAVING
    15 G ST 64.23
    16 NORWOOD CIR E 63.94
    17 JONES ST 63.31
    18 WARE ST 62.06
    19 PALM BEACH AVE 62.00
    20 ARCHER ST 61.86
    21 OKLAHOMA AVE 61.54
    22 REMSHART ST 61.52
    23 BAKER ST 61.41
    24 FORREST AVE 61.35
    25 GROVE AVE 61.06
    26 JENKINS ST 60.68
    27 BAILEY ST 60.37
    28 DONALD ST 60.37
    29 CITY BLVD N 59.84
    30 VERNON WILLIS DR 59.46
    31 JOHNSON AVE 59.46
    32 BUTLER ST 59.42
    33 SHORT BEWICK ST 59.32
    34 FRANKLIN ST 59.15
    35 E L SAUNDERS DR 59.10
    36 GROOVER ST 59.08
    37 CITY BLVD S 58.89
    38 RAYMOND ANNE COOPER DR 58.89
    39 GILMORE ST 58.83
    40 MYERS AVE 58.26
    41 GARLINGTON AVE 58.12
    42 FIREMAN ST 58.10
    43 EFFIE ST 58.08
    44 REAGAN CIR 58.00
    45 WILLIAMS ST 57.99
    46 GENOA ST 57.96
    47 ABC AVE 57.88
    48 AMANDA ST 57.69
    49 HABERSHAM DR 57.32
    50 JEWEL ST 57.24
    51 KING ST 57.17
    52 ETHEL ST 56.80
    53 PEARLIE BOWDEN DR 56.59
    54 ROSSER ST 56.22
    55 CLINTON ST 56.13
    56 PENNSYLVANIA AVE 56.01
    57 HARRISON ST 55.97
    58 WESTGATE DR 55.80
    59 MORNINGSIDE DR 55.25
    60 PHILLIPS AVE 55.20
    61 FOLKS ST 55.10
    62 PIONEER ST 55.09
    63 YOUNG ST 55.00
    64 SUNNYSIDE DR 54.94
    65 FERN ST 54.84
    66 M ST 54.75
    67 NEW ST 54.68
    68 GLASS ST 54.44
    69 REED ST 54.43
    70 COLLEGE ST 54.42
    71 MINNESOTA AVE 54.41
    72 CENTRAL AVE 54.30
    73 STELLA ST 54.22
    74 ALPHA ST 54.18
    75 ARNOLD MCKINNEY DR 54.02
    76 NORWOOD DR 53.96
    77 OAK ST 53.93
    78 CLIFFORD ST 53.83
    79 LAUREL ST 53.68
    80 PRESCOTT ST 53.43
    81 ANGUILLA ST 53.38
    82 SUMMIT ST 53.35
    83 ALICE ST 53.23
    84 BIBB ST 53.17
    85 GREENWOOD ST 53.13
    86 CARSWELL AVE 53.01
    87 FRANCES ST 52.91
    88 MONROE STREET 52.85
    89 CENTER ST 52.67
    90 H J ECHOLS ST 52.54
    91 PINEVIEW DR 52.52
    92 MORTON AVE 52.39
    93 AVALON PL 52.24
    94 WOODWARD ST 52.22
    95 FAIRWAY DR 52.08
    96 MCDONALD ST 52.00
    97 SEQUOYAH CIR 51.96
    98 MCQUAIG ST 51.80
    99 GEORGIA AVE 51.72
    100 ABNER ST 51.71
Dirt Road Paving/Surfacing Update

Per the 2023 SPLOST referendum approved by voters, all remaining dirt roads within the city limits are scheduled to be paved or surfaced over the next eighteen months.

Dirt Roads List

  • COMPLETED DIRT ROAD PAVING LIST
    Goodwin Street
    Howe Street
    Carver Street
    James Street
    N. City Blvd
    Murphy Lane
    Gus Karle Parkway
    Izlar Street
    Jane Street
    Seaman Street
    Pine Street
    Porter Street
    Watts Street
    Robert Lane
     
  • ONGOING DIRT ROAD PAVING LIST

    Under Contract:
    Greenwood Street
    Browns Alley
    E. Hamilton Avenue
    Boulevard Street
    Georgia Street
    Morehouse Street

    Under Design:
    Satilla Lane
    James Lane
    Deputy Street
    Barbara Street
    Johanna Street
    Hamilton Street
    Holiday Street

    Next Contract:
    Montgomery Street
    Montgomery Street
    Shadow Lawn
    Osceola Avenue
    Upchurch Street
    Coachman Street
    Mary Street
    Cleo Street

  • FUTURE DIRT ROAD PAVING LIST

    To be Paved:
    Morton Lane
    Overton Avenue
    Oxford Street
    Atlantic Avenue
    Marshall Drive
    Cherokee Circle
    Scruggs Street
    Lakeview Drive
    Homer Street
    Carter Lane
    Jackson Street
    Emerson Street
    Commons Street
    Myers Street
    Byck Street
    Banks Street
    Myers Street
    Bob Street
    L Street
    Bennett Street
    Hay Street
    Fir Street