The City of Waycross Engineering Division is responsible for programming, design, construction, operations, and maintenance of the City’s primary infrastructure including but not limited to city pavements and sidewalks, storm drainage, water production and distribution, waste-water collection and treatment, traffic signals, signs and public buildings.
The Engineering Division also provides technical support to other city departments and citizens to include environmental permitting, traffic engineering, street lighting, street/alley closings, annexations, computer-aided drafting, mapping and geographical information system development.
2015 CDBG Infrastructure Improvements
The Team
Engineering Coordinator
Dawn Strickland
Provides administrative support for the City Engineer and departmental staff. This includes conducting extensive research, arranging schedules, handling calls and correspondence, liaising with internal and external parties, reviewing contracts and other documentation, and managing the flow of documents and information across the department.
Project Manager
Steve Pope
The Project Manager is responsible for capital project master plan development and execution. This position plans, programs and manages capital projects for the City’s primary infrastructure (storm-water, pavement and underground utilities).
NOTIFICATIONS & REPORTS
- City of Waycross – Annual Water Quality Report
- City of Waycross – Annual Industrial Water Quality Report
- City of Waycross – Water Quality Public Notification
- City of Waycross – Industrial Water Quality Public Notification
- City of Waycross – W&S Tap Fee Schedule
The current street paving list was developed using advanced robotics data combined with Georgia Department of Transportation (GDOT) usage statistics. This technology-driven approach enabled us to rank streets from those most in need of paving to those least, ensuring an efficient and data-informed strategy. Our long-term goal is to repave 200 streets over the next 10 years.
If you have questions or would like more information, please get in touch with City Manager Duke Rayford to schedule a time to discuss.
Street List
COMPLETED STREET PAVING
JANE STREET
HANOVER DRIVE
BEVILLE STREET
RICHMOND AVENUE
N. CRAWFORD STREETIN PROGRESS STREET PAVING
1 GILMORE ST (North) 80.03 2 KENTUCKY AVE 78.33 4 PARKWAY DR 70.03 7 PALMETTO RD 66.95 8 OLD BRUNEL ST 66.76 9 NICHOLLS ST N 66.43 10 BRUNEL ST 66.36 11 GARLINGTON HGTS 66.22 12 SCREVEN AVE 66.04 13 SOLOMON ST 66.04 14 WASHINGTON AVE 65.72 ONGOING STREET PAVING
15 G ST 64.23 16 NORWOOD CIR E 63.94 17 JONES ST 63.31 18 WARE ST 62.06 19 PALM BEACH AVE 62.00 20 ARCHER ST 61.86 21 OKLAHOMA AVE 61.54 22 REMSHART ST 61.52 23 BAKER ST 61.41 24 FORREST AVE 61.35 25 GROVE AVE 61.06 26 JENKINS ST 60.68 27 BAILEY ST 60.37 28 DONALD ST 60.37 29 CITY BLVD N 59.84 30 VERNON WILLIS DR 59.46 31 JOHNSON AVE 59.46 32 BUTLER ST 59.42 33 SHORT BEWICK ST 59.32 34 FRANKLIN ST 59.15 35 E L SAUNDERS DR 59.10 36 GROOVER ST 59.08 37 CITY BLVD S 58.89 38 RAYMOND ANNE COOPER DR 58.89 39 GILMORE ST 58.83 40 MYERS AVE 58.26 41 GARLINGTON AVE 58.12 42 FIREMAN ST 58.10 43 EFFIE ST 58.08 44 REAGAN CIR 58.00 45 WILLIAMS ST 57.99 46 GENOA ST 57.96 47 ABC AVE 57.88 48 AMANDA ST 57.69 49 HABERSHAM DR 57.32 50 JEWEL ST 57.24 51 KING ST 57.17 52 ETHEL ST 56.80 53 PEARLIE BOWDEN DR 56.59 54 ROSSER ST 56.22 55 CLINTON ST 56.13 56 PENNSYLVANIA AVE 56.01 57 HARRISON ST 55.97 58 WESTGATE DR 55.80 59 MORNINGSIDE DR 55.25 60 PHILLIPS AVE 55.20 61 FOLKS ST 55.10 62 PIONEER ST 55.09 63 YOUNG ST 55.00 64 SUNNYSIDE DR 54.94 65 FERN ST 54.84 66 M ST 54.75 67 NEW ST 54.68 68 GLASS ST 54.44 69 REED ST 54.43 70 COLLEGE ST 54.42 71 MINNESOTA AVE 54.41 72 CENTRAL AVE 54.30 73 STELLA ST 54.22 74 ALPHA ST 54.18 75 ARNOLD MCKINNEY DR 54.02 76 NORWOOD DR 53.96 77 OAK ST 53.93 78 CLIFFORD ST 53.83 79 LAUREL ST 53.68 80 PRESCOTT ST 53.43 81 ANGUILLA ST 53.38 82 SUMMIT ST 53.35 83 ALICE ST 53.23 84 BIBB ST 53.17 85 GREENWOOD ST 53.13 86 CARSWELL AVE 53.01 87 FRANCES ST 52.91 88 MONROE STREET 52.85 89 CENTER ST 52.67 90 H J ECHOLS ST 52.54 91 PINEVIEW DR 52.52 92 MORTON AVE 52.39 93 AVALON PL 52.24 94 WOODWARD ST 52.22 95 FAIRWAY DR 52.08 96 MCDONALD ST 52.00 97 SEQUOYAH CIR 51.96 98 MCQUAIG ST 51.80 99 GEORGIA AVE 51.72 100 ABNER ST 51.71
Per the 2023 SPLOST referendum approved by voters, all remaining dirt roads within the city limits are scheduled to be paved or surfaced over the next eighteen months.
Dirt Roads List
COMPLETED DIRT ROAD PAVING LIST
Goodwin Street
Howe Street
Carver Street
James Street
N. City Blvd
Murphy Lane
Gus Karle Parkway
Izlar Street
Jane Street
Seaman Street
Pine Street
Porter Street
Watts Street
Robert Lane
ONGOING DIRT ROAD PAVING LIST
Under Contract:
Greenwood Street
Browns Alley
E. Hamilton Avenue
Boulevard Street
Georgia Street
Morehouse Street
Under Design:
Satilla Lane
James Lane
Deputy Street
Barbara Street
Johanna Street
Hamilton Street
Holiday Street
Next Contract:
Montgomery Street
Montgomery Street
Shadow Lawn
Osceola Avenue
Upchurch Street
Coachman Street
Mary Street
Cleo StreetFUTURE DIRT ROAD PAVING LIST
To be Paved:
Morton Lane
Overton Avenue
Oxford Street
Atlantic Avenue
Marshall Drive
Cherokee Circle
Scruggs Street
Lakeview Drive
Homer Street
Carter Lane
Jackson Street
Emerson Street
Commons Street
Myers Street
Byck Street
Banks Street
Myers Street
Bob Street
L Street
Bennett Street
Hay Street
Fir Street